Bibinagar Guntur Railway Doubling

Bibinagar Guntur Railway Doubling

Home  /   Telangana  /   Railways  /   Bibinagar Guntur Railway Doubling

The doubling of Bibinagar Guntur Railway Line will enhance mobility and strengthen ties between Telangana and Andhra Pradesh.

Telangana
Bibinagar Guntur Railway Doubling
Section wise target of Bibinagar Guntur railway doubling

Right to Information (RTI) reply on section wise targets of Bibinagar Guntur railway doubling. Bibinagar Guntur railway double line tentative planning for commissioning is stated below. Year Target Km Targetted Section Length Km 2025-26 58.29 Kukkadam-Vishnupuram 30.00 Kukkadam-Nalgonda 28.29 2026-27 64.96 Pondugula-Nadikudi 9.34 Nalgonda-Chityala 25.63 Vishnupuram-Pondugula 8.38 Chityala-Valigonda 21.61 2027-28 94.81 Nadikudi-Piduguralla 21.15 Piduguralla-Reddigudem 19.81 Reddigudem-Peddakurapadu 24.65 Peddakurapadu-Nallapadu 24.62 Paigidpalli-Bommaipalli 4.584.58 2028-29 20.94 Bommaipalli-Valigonda 20.94 Total 239.00 Km

20-01-2025 14:39  |  Read More

About Us  |  Contact Us  |  Privacy Policy  |  Terms and Conditions

© Copyright 2025 All Rights Reserved By Bharat Ways.

Facebook Twitter X Instagram YouTube LinkedIn